Alpha Pure-RX
Current model: REC450AA–REC470AA Pure-RX
Premium high-density residential panels for roofs where usable space matters.
Premium high-density residential panels for roofs where usable space matters.
REC Alpha Pure-RX panels use heterojunction cell technology to deliver high output and efficiency in a practical residential format. The current series reaches 470 W and up to 22.6% module efficiency.
Final model, configuration, availability, and warranty terms are confirmed in the written proposal.
REC Alpha Pure-RX at a glance.
These manufacturer-published figures help compare equipment. Final compatibility, configuration, and warranty coverage are confirmed for the specific project.
| Specification | Published value |
|---|---|
| Model family | REC450AA · REC460AA · REC470AA Pure-RX |
| Rated power | 450–470 W |
| Module efficiency | Up to 22.6% |
| Cell technology | Heterojunction (HJT) |
| Pmax temperature coefficient | −0.24%/°C |
| Warranty | 25-year product and performance · at least 92% power in year 25 |
Strengths worth putting into context.
- High power density for constrained roof areas
- Heterojunction cell technology
- Strong performance retention specification
- Full-black residential appearance
Projects with these priorities.
- Homes with limited high-quality roof area
- Projects prioritizing premium module efficiency
- Homeowners who prefer an all-black module appearance
Questions we answer before specifying Alpha Pure-RX.
- How many modules fit on the usable roof planes?
- Which inverter pairing is appropriate?
- Does the proposed installer status affect available warranty coverage?
- How does the premium compare with added production on this roof?
Specifications are only the starting point.
Published capacity, output, efficiency, and warranty information help narrow the field. A valid Florida project also requires compatible electrical design, roof or mounting review, permits, utility interconnection, manufacturer instructions, and a clear service plan.
We use the current manufacturer documentation when preparing the final system scope. If equipment availability changes, any proposed substitution should be documented and reviewed before installation.